I am not positive when each step was completed. I read they also lowered the center field area 6" and raised the left and right field playing area 12" (or vise versa), so i assumed it was all done this spring when the field was under construction. I know each time I drove by the stadium this spring the entire infield and outfield was ripped up and looked to be being redone.